Skip Ribbon Commands
Skip to main content
  
  
  
  
collapse Document Types : Bid Documents ‎(4)
Ad for Bids_Hydration Stations Group 5.pdf
  
6/27/2023 10:55 AMPedregon Rey
Final Bid Tabulation - Hydration Stations Group 5.pdf
  
8/31/2023 2:47 PMPedregon Rey
Straight Line PSA Letter of Assent.pdf
  
8/31/2023 2:50 PMPedregon Rey
Straight Line Subcontractors List.pdf
  
8/31/2023 2:48 PMPedregon Rey
collapse Document Types : LOA and Sub Pre-Job Form ‎(9)
ASE Contracting Pre-Job form.pdf
  
8/31/2023 2:51 PMPedregon Rey
ASE LOA.pdf
  
9/1/2023 12:53 PMPedregon Rey
B and M PAINTING LOA.pdf
  
9/1/2023 12:57 PMPedregon Rey
B and M Painting Pre-Job form.pdf
  
9/5/2023 10:30 AMPedregon Rey
E.L. Hobbs Pre-Job form.pdf
  
9/6/2023 12:16 PMPedregon Rey
EL Hobbs LOA.pdf
  
9/1/2023 12:54 PMPedregon Rey
EL Hobbs Pre-Job form (revised).pdf
  
9/14/2023 2:27 PMPedregon Rey
Paul J Construction Pre-Job form.pdf
  
9/6/2023 12:18 PMPedregon Rey
Paul J LOA.pdf
  
9/1/2023 12:54 PMPedregon Rey
collapse Document Types : Pre-Job Conf. (PJC) Meetings ‎(3)
2023-09-07 PJCM Furnish_Install Hydra Stations10Sites, Group 5 Straight Line GC CP24-0222-00 _Recording.mp4
  
9/7/2023 10:08 AMWalden Loretta
2023-09-07 PJCM Furnish_Install Hydra Stations10Sites, Group 5 Straight Line GC CP24-0222-00_Attendee Report.pdf
  
9/7/2023 10:09 AMWalden Loretta
2023-09-07 PJCM Furnish_Install Hydra Stations10Sites, Group 5 Straight Line GC CP24-0222-00_Chat.txt
  
9/7/2023 10:09 AMWalden Loretta
collapse Document Types : Pre-Job Form ‎(2)
Straight Line GC Pre-Job form (revised 1).pdf
  
9/12/2023 11:36 AMPedregon Rey
Straight Line GC Pre-Job form.pdf
  
9/6/2023 12:16 PMPedregon Rey